Design preview. These are mockups of the planned apps, not working screens.

The apps

iPhone and Android versions of the same practice: pick an exam, answer with the book and page in front of you, see your weakest topics, and get one or two questions a day on your phone.

iPhone

Scroll sideways to see each screen.

7:41
Pick your exam

Most candidates take

Business & Finance6 books
General, Building & Residential18 books

Trades

Underground Utility11 books
Plumbing12 books
Gas Line13 books
Air "A"15 books
Roofing11 books
Start 10 free questions
Pick your examAll 33 Florida exams, with how many books each one uses.
7:43
CloseFree trial3 of 10
Underground UtilityExcavating

You are trenching on dry land. At least how far ahead must you notify Sunshine 811?

A24 hours
B2 full business days
C5 calendar days

Right. Under water it is 10 full business days.

p. 49Sunshine 811 Guide (2021), s. 556.105(1)(a), F.S.
Add p. 49 to highlight listNext question
Answer with the pageEvery answer names the book and page, like a tab on your copy.
8:02
ExamsProgress
Underground Utility
61%across 60 practice questions. 70% passes.
Pre-Installation20% of exam
Excavating, Backfill, and Compaction20%
Pipe Installation and Repairs15%
Piping, Valves and Fittings15%
Testing, Disinfecting and Job Close Out10%
Equipment10%
Traffic Control5%
Drainage Systems5%

Biggest gain: Excavating, 20% of the exam and your lowest score.

Practice Excavating
Weakest topics firstContent areas and weights from the DBPR exam content sheet. Scores are sample data.
Thursday, November 197:42
Contractor Allynow

Daily question 1 of 2, Service Pool
When do annual public pool operating permits expire?

June 30September 30December 31
Daily questionsAnswer from the lock screen. You pick one or two a day and the time.
9:15
PPipeAnswers from your exam's books

How long is my Sunshine 811 locate ticket good for?

30 calendar days from the day you submit it, for both normal and underwater tickets.

s. 556.105(1)(c), F.S.; Sunshine 811 Damage Prevention Guide (2021), pp. 36 and 50

And how much notice for a dig under water?

At least 10 full business days before you start. On dry land it's 2.

s. 556.105(1)(a), F.S.; same guide, p. 49
Ask Pipe about a code or rule
PipeAsk in plain words. Pipe quotes the source and the page. Pipe it up.

Android

The same features, with Android's navigation, notifications and controls.

7:44
Free trial, 4 of 10
Underground UtilityExcavating

The dig site is under water. At least how far ahead must you notify Sunshine 811?

A2 full business days
B5 full business days
C10 full business days

Right. Dry-land digs need 2 full business days.

p. 49Sunshine 811 Guide (2021), s. 556.105(1)(a), F.S.
Next question
Answer with the pageSame question flow with Material controls.
8:10
Highlight list
Underground UtilityTo tab (2)Tabbed (1)

Sunshine 811 Damage Prevention Guide (2021)

p. 36Ticket types: normal and underwater, each valid 30 calendar days
p. 49s. 556.105(1)(a): 2 full business days’ notice, 10 if under water
p. 50s. 556.105(1)(c): ticket information valid 30 calendar days

FDOT Utility Accommodation Manual (2017)

No pages yet. Pages appear here as you answer questions about this book.
Print list
Highlight listEvery page you've been sent to, by book. Check them off as you tab your copies.
2:15
Contractor Ally, now

Daily question 2 of 2, Underground Utility
How long is the information on a Sunshine 811 ticket valid?

AnswerLater
Contractor Ally, 7:42 AM

Right: June 30. Rule 64E-9.001(4), F.A.C. Added to your highlight list.

Daily questionsAnswer from the notification shade or open the app.