You are trenching on dry land. At least how far ahead must you notify Sunshine 811?
Right. Under water it is 10 full business days.
Biggest gain: Excavating, 20% of the exam and your lowest score.
Daily question 1 of 2, Service Pool
When do annual public pool operating permits expire?
How long is my Sunshine 811 locate ticket good for?
30 calendar days from the day you submit it, for both normal and underwater tickets.
s. 556.105(1)(c), F.S.; Sunshine 811 Damage Prevention Guide (2021), pp. 36 and 50And how much notice for a dig under water?
At least 10 full business days before you start. On dry land it's 2.
s. 556.105(1)(a), F.S.; same guide, p. 49Android
The same features, with Android's navigation, notifications and controls.
The dig site is under water. At least how far ahead must you notify Sunshine 811?
Right. Dry-land digs need 2 full business days.
Sunshine 811 Damage Prevention Guide (2021)
FDOT Utility Accommodation Manual (2017)
Daily question 2 of 2, Underground Utility
How long is the information on a Sunshine 811 ticket valid?
Right: June 30. Rule 64E-9.001(4), F.A.C. Added to your highlight list.